Hydraulic Jacking Construction Technology for 150,000 m³ Ultra-Large Crude Oil Storage Tanks

Product name:Hydraulic Jacking Construction Technology for 150,000 m³ Ultra-Large Crude Oil Storage Tanks
Keywords:Hydraulic Jacking Construction Technology for 150,000 m³ Ultra-Large Crude Oil Storage Tanks
Industry:Petroleum, natural gas and chemical industry - Petroleum and natural gas industry
Process:Sheet metal - Various types of cutting
Material:Carbon steel

Processing manufacturer

  • There are 48 manufacturers that provide similar products
  • There are 175 manufacturers that provide this processing technology
  • There are 85 manufacturers that provide this material processing service
  • There are 162 manufacturers that provide this industry processing service

Product details

The hydraulic jacking construction of the 150,000 m³ crude oil storage tank adopts a distributed hydraulic system, equipped with 32 synchronous jacks of 500 tons each (stroke error ≤ 0.5mm), and achieves precise synchronous jacking at a speed of 0.8m/h through PLC control. Before construction, the tank bottom plate welding (radial weld spacing ≥ 200mm) and the first ring of shell plate assembly (verticality deviation ≤ 1.5‰) must be completed, and a ring-shaped wind-resistant ring (spacing ≤ 3m) should be set to enhance structural stability.

The jacking process adopts the "three synchronizations" control principle: 1) Hydraulic system pressure synchronous fluctuation ≤ ±2MPa; 2) Tank level deviation ≤ 3mm; 3) Shell plate weld stress monitoring ≤ 0.8fy. After each 1.5m of jacking, the operation is suspended to perform the next ring of shell plate assembly welding (longitudinal seams staggered by 1/3 of the plate length). Laser rangefinders are used throughout the process to monitor the tanks ovality in real-time (deformation ≤ 0.3%D).

This technology reduces the construction period by 40% and labor costs by 60% compared to the traditional normal installation method. Application in a certain project shows that the total jacking time for a 150,000 m³ storage tank is 72 hours, the maximum tank displacement is only 2.3mm, and the first-time welding qualification rate reaches 99.2%, which meets the requirements of API 653 and GB 50128 standards.

Similar products

More
What are the machining processes used for processing axial fan housings

What are the machining processes used for processing axial fan housings

Process : Sheet metal - Welding
Material : Carbon steel
Machining Process Analysis of Carbon Steel Fixed Anchor Plates

Machining Process Analysis of Carbon Steel Fixed Anchor Plates

Process : Machining - CNC milling or milling machining
Material : Carbon steel
Precision Machining of U-Steel Profiles for Building Applications

Precision Machining of U-Steel Profiles for Building Applications

Process : Stamping - General stamping
Material : Aluminum
Custom Fabrication of S355JR Welded H-Beams for Construction Projects

Custom Fabrication of S355JR Welded H-Beams for Construction Projects

Process : Sheet metal - Welding
Material : Carbon steel
Heavy-Walled Flange Milling-Turning Machining and Flaw Detection

Heavy-Walled Flange Milling-Turning Machining and Flaw Detection

Process : Machining - Turning Milling compound
Material : Alloy steel
Drill Stabilizers Applied in Oil Drilling Platforms

Drill Stabilizers Applied in Oil Drilling Platforms

Process : Machining - Five-axis machining
Material : Alloy steel
Cone Crusher Mantle

Cone Crusher Mantle

Process : -
Material :

More products

More
What are the machining processes used for processing axial fan housings

What are the machining processes used for processing axial fan housings

Process : Sheet metal - Welding
Material : Carbon steel
Machining Process Analysis of Carbon Steel Fixed Anchor Plates

Machining Process Analysis of Carbon Steel Fixed Anchor Plates

Process : Machining - CNC milling or milling machining
Material : Carbon steel
Precision Machining of U-Steel Profiles for Building Applications

Precision Machining of U-Steel Profiles for Building Applications

Process : Stamping - General stamping
Material : Aluminum
Custom Fabrication of S355JR Welded H-Beams for Construction Projects

Custom Fabrication of S355JR Welded H-Beams for Construction Projects

Process : Sheet metal - Welding
Material : Carbon steel
Heavy-Walled Flange Milling-Turning Machining and Flaw Detection

Heavy-Walled Flange Milling-Turning Machining and Flaw Detection

Process : Machining - Turning Milling compound
Material : Alloy steel
Drill Stabilizers Applied in Oil Drilling Platforms

Drill Stabilizers Applied in Oil Drilling Platforms

Process : Machining - Five-axis machining
Material : Alloy steel
Cone Crusher Mantle

Cone Crusher Mantle

Process : -
Material :